DONGGUAN CITY XANDER AUTOMOTIVE STAMPING&TOOLING CO,.LTD
|
Gold Index: 6869
Place of Origin: | Guangdong, China (Mainland) |
![]() |
|
Add to My Favorites | |
HiSupplier Escrow |
OA Components
Item | Description |
Mould Material | SKD11, D2, SKH51, SKD61, Cr12MoV ,etc |
Work piece Material | Alloy steel: SKD11, SKD61, Cr12MoV, SLD, DC53 High speed steel: |
SKH51, SKH9, YXM1 | |
Mould Tolerance | 0.001-0.003 mm |
Productions Cover | Sheet metal auto parts, Auto stamping parts, Home Electrics stamping |
parts, Device stamping parts, etc | |
Productivity | Max 800 pcs/min, normally 40-60pcs/min |
Work piece Precision | 0.005mm |
Market | Inner |
Life Time | Max 1 million times, normally 0.3-0.5million times |
Surface Treatment | Powder coating, Painting, Polishing |
Service | OEM / ODM service |
production flow:
Drawing release |
Customer issued PDF, 2D or 3D drawing to us, if no drawing, customer can send samples to us for reference. |
Quotation reply |
After receiving customer new RFQ, we'll quote to customer within 3days, including CIF, FOB or others |
Material & Manufacture Confirmation |
After quotation approval, we'll provide detail information to customer, the material types, such as DC53, K110, S390, S690, S790 etc. |
Life time |
The tooling life time, and tooling component life time, and the parameter data, we can meet 100% surface finish, 0.001-0.003 size tolerance, for rotor stator, the rotation for lamination within 180 degree, and the stamping speed can reach 350-400 strokes per min. |
Lead time feedback |
Usually the tooling components lead time is 1-3weeks, and mold manufacture is about 1-6 months, we will feedback the lead time according customer precision request. this is just manufacture time, not including the shipment time. |
Payment discussion |
We can accept the TT, LC, Payment advance, or others |
Samples submit |
If the die manufacture, we'll submit 2-5pcs to customer for checking, other extra quantity, will be take charge of it. |
Sample approval |
Customer checking the samples, please approval to us by written form. |
Shipment arrangement |
Normally the shipment will according customer request, by DHL, FEDEX , UPS or by sea, by air. |
The goods confirm |
The goods confirmed by our customer passed ISO9001, we'll do full inspect before shipment |
The balance payment finish |
After customer confirm the goods, the balance payment should finish within 2weeks. |
DONGGUAN CITY XANDER AUTOMOTIVE STAMPING&TOOLING CO,.LTD [China (Mainland)]
Business Type:Manufacturer
City: Dongguan
Province/State: Guangdong
Country/Region: China (Mainland)