Tandem / Stage Tool for Auto Stamping Parts
Tooling Description
Tool Type: Tandem / stage die for auto parts
Tool Size: 500*400*450 mm
Operations: 5 operations
Tooling Steel: DC53 / D2 / Cr12MoV / P20 / S45C
Gas Spring: Misumi
Die Life: 500,000-2,000,000 strokes
Treatment to forming: TD coating
3D software for designing: UG, Catia, Visi
2D software: Autocad, Presscad
production flow:
Drawing release |
Customer issued PDF, 2D or 3D drawing to us, if no drawing, customer can send samples to us for reference. |
Quotation reply |
After receiving customer new RFQ, we'll quote to customer within 3days, including CIF, FOB or others |
Material & Manufacture Confirmation |
After quotation approval, we'll provide detail information to customer, the material types, such as DC53, K110, S390, S690, S790 etc. |
Life time |
The tooling life time, and tooling component life time, and the parameter data, we can meet 100% surface finish, 0.001-0.003 size tolerance, for rotor stator, the rotation for lamination within 180 degree, and the stamping speed can reach 350-400 strokes per min. |
Lead time feedback |
Usually the tooling components lead time is 1-3weeks, and mold manufacture is about 1-6 months, we will feedback the lead time according customer precision request. this is just manufacture time, not including the shipment time. |
Payment discussion |
We can accept the TT, LC, Payment advance, or others |
Samples submit |
If the die manufacture, we'll submit 2-5pcs to customer for checking, other extra quantity, will be taken charge of by us. |
Sample approval |
Customer checking the samples, please approval to us by written form. |
Shipment arrangement |
Normally the shipment will according customer request, by DHL, FEDEX , UPS or by sea, by air. |
The goods confirm |
The goods confirmed by our customer passed ISO9001:2008 , we'll do full inspect before shipment |
The balance payment finish |
After customer confirm the goods, the balance payment should finish within 2 weeks. |